The joint 2026 Concentrated Inspection Campaign (CIC) on cargo securing by the Paris and Tokyo Memoranda of Understanding (MoUs) remains in force through 30 November 2026. Port State Control Officers (PSCOs) are applying a dedicated questionnaire during routine inspections to assess how cargo units and cargo transport units are loaded, stowed and secured under applicable SOLAS requirements.

This is not a newly announced regulation, and it does not mean every container or every vessel will receive a separate inspection. It is a focused campaign within normal Port State Control activity. For cargo owners, importers and procurement teams, the practical exposure is usually indirect: a vessel deficiency can disrupt a sailing, while poor packing, inaccurate weights or incomplete cargo information can make safe stowage harder to demonstrate.

Buyer takeaway: The campaign tests vessel-level cargo-securing compliance, but cargo interests influence the quality of the weights, packing and shipment data that support safe stowage. Keep the carrier’s approved arrangements and the CTU packing process aligned.

What inspectors are checking

The official questionnaire contains ten numbered questions, including sub-parts. It covers whether the vessel carries an approved, ship-specific Cargo Securing Manual (CSM); whether that manual gives clear lashing instructions for the stowage situations on board; and whether relevant officers understand stack weights, tier-weight distribution and limits for tank tops, hatch covers and decks.

It also asks whether the CSM is followed in practice, whether the cargo plan reflects each container’s verified gross mass (VGM), whether approved portable securing devices are available and in good condition, and whether cargo stowage preserves bridge visibility. Heavy-weather procedures and arrangements to prevent cargo loss are also covered. The Cargo Safe Access Plan (CSAP) question is marked for information only.

The distinction between a recorded deficiency and possible detention matters. The questionnaire says that a “No” answer to questions 1–10, excluding questions 6 and 10a, must be accompanied by a relevant deficiency in the inspection report. Eight questions are marked with an asterisk; a “No” against one of those may lead the ship to be considered for detention. Detention is not automatic: the Paris and Tokyo MoUs say port-State action can range from recording a deficiency to detaining the vessel.

A ship is subject to only one inspection under this CIC during the campaign period per MoU. The campaign is being carried out alongside routine inspections, not as a separate inspection of each cargo lot.

Why procurement teams should care

The vessel operator controls the ship’s approved CSM and the shipboard lashing arrangements. A cargo buyer does not replace the master, the carrier or the competent authority. But the ship’s ability to load and secure cargo safely depends on reliable information from the cargo side: actual gross weight, dimensions, centre of gravity where relevant, packing method, cargo characteristics and any non-standard handling requirements.

Inside the container, inadequate blocking, bracing or securing can allow cargo to shift even if the container itself is correctly locked to the ship. The International Maritime Organization (IMO) notes that poor cargo transport unit packing, overloading and incorrect declarations have contributed to transport incidents, including risks to workers who did not control how the unit was packed.

The commercial consequences vary by contract and incident. A deficiency may require corrective work, re-stuffing, a survey, a change of vessel or a missed cut-off. Storage, terminal handling, rebooking and schedule costs may follow. The campaign itself does not create a new universal fee or guarantee detention; it increases attention on whether existing safety requirements are being followed.

Keep vessel and container responsibilities separate

SOLAS requirements and the vessel’s approved CSM govern shipboard loading, stowage and securing. The IMO/ILO/UNECE CTU Code is a non-mandatory global code of practice for packing cargo transport units for sea and land transport. It provides guidance across the intermodal chain, including for those responsible for packing and securing cargo and those who receive and unpack units.

For a buyer, that means two related but different checks are needed: confirm that the carrier’s vessel and stowage arrangements are suitable for the cargo, and confirm that the supplier or appointed packer has secured the cargo properly inside the unit. A packing certificate or a photograph is useful evidence, but neither should be treated as a substitute for a technically sound packing plan or the carrier’s approved requirements.

Five checks before the next sailing

  1. Confirm the vessel and cargo requirements. Ask the carrier or forwarder to confirm that the vessel has an approved, ship-specific CSM and that the cargo fits its weight, stack and deck limits. Supply accurate dimensions, weights, lifting points and handling constraints before final booking.
  2. Reconcile weights and cargo data. Match gross weight, VGM, packing list and cargo description. Resolve discrepancies before terminal cut-off; the cargo plan must reflect the VGM of the containers being loaded.
  3. Review stuffing and internal securing. Identify who packs and supervises the CTU. Check weight distribution, blocking, bracing, dunnage and suitable securing points. For non-standard, heavy or fragile cargo, use a competent packer or engineer. Keep dated loading photographs and the packer’s completion record.
  4. Check the equipment and the shipboard interface. Confirm that shipper-supplied securing equipment matches carrier instructions and is serviceable. The vessel operator remains responsible for approved shipboard devices and CSM maintenance; generic straps, chains or fittings are not automatic substitutes.
  5. Put responsibilities and disruption costs in writing. Purchase orders and freight instructions should allocate responsibility for packing, VGM, cargo data, special handling and non-standard cargo approval. Agree how corrective packing, survey, storage, rebooking and missed-sailing costs will be handled if cargo is unsafe or materially misdeclared. Retain the records.

What changes after 30 November?

The CIC ends on 30 November 2026, but the underlying safety requirements do not expire with the campaign. Carriers and shippers should continue to follow applicable SOLAS requirements, the approved CSM and relevant packing guidance after the focused inspection period has ended.

For shipments moving before the end of November, use the official questionnaire as a readiness prompt rather than assuming that an inspection will or will not occur. For later shipments, keep the same packing, weight and documentation controls in place. If a cargo is unusual, heavy, out-of-gauge or sensitive to movement, resolve the stowage and securing plan with the carrier before the unit reaches the port.

For broader freight-cost planning, see One Discovery’s November container freight contract checklist. Cargo safety and freight pricing are separate questions, but both should be settled before a shipment is committed.

Sources

General trade and procurement information only; not legal, maritime-safety or technical advice. Confirm vessel-specific requirements, packing methods and contractual responsibilities with the carrier, qualified packer and relevant advisers before shipment.